Bathroom Renovation Richmond: Vetted Builders, Matched Quotes

A bathroom renovation in Richmond upon Thames costs £4,500-£12,000 for a standard bathroom and £12,000-£30,000+ for a high-specification or structural conversion. Richmond’s Victorian and Edwardian stock often presents specific challenges: narrow rooms, original cast iron or blocked drainage, and lime plaster walls. Get 3 matched quotes from vetted Richmond bathroom specialists.

SIMPLE PROCESS

How do renovation quotes in London work with QuoteMyRenovation?

Four steps take you from the first idea to a finished project, paying as the work progresses.

Tell us about your project (3 minutes)

Tell us about your project (3 minutes)

Choose the renovation type, your property, your budget range, when you'd like to start and your postcode. These are the questions a builder asks before quoting, so the quotes you get back are accurate rather than guesses.
We match you with vetted builders (within 24 hours)

We match you with vetted builders (within 24 hours)

We review your brief and send it to renovation specialists who cover your borough, do that type of project and have capacity at the time you want to start. Your brief goes only to those builders.
Compare your matched quotes (within 5 working days)

Compare your matched quotes (within 5 working days)

You receive up to three itemised quotes, ask questions, and choose the builder you're most comfortable with, or none at all. There's no obligation to go ahead.
Pay as the work progresses (milestone payments)

Pay as the work progresses (milestone payments)

Every builder in our network agrees to milestone payments, so you pay in stages as each part of the job is finished. We check in with you before each payment. See how milestone payments work

What are you renovating?

Featured Renovation Partner

Our founding partner for kitchens, bathrooms, extensions and full refurbishments across Chelsea and south-west London.

Bathroom Renovation Wandsworth

How much does a bathroom renovation cost in Richmond?

Bathroom renovation costs in Richmond upon Thames depend on room size, specification, and whether the project involves structural or drainage works. Richmond (TW9, TW10), Kew, Barnes (SW13), and East Sheen (SW14) sit at inner London rates typically 20-30% above the London average. Twickenham (TW1, TW2), Teddington (TW11), and Hampton (TW12) run closer to the London average.

Richmond pricing note: Richmond (TW9, TW10), Kew, Barnes (SW13), and East Sheen (SW14) typically sit 20–30% above the London average. Twickenham (TW1, TW2), Teddington (TW11), and Hampton (TW12) run closer to average. Costs below reflect the London average baseline.
Scope / Type Typical Cost Programme Planning / Regs
Standard Bathroom Renovation
Basic renovation — sanitaryware swap and retile Like-for-like replacement. New bath, basin, WC, tiles. No layout change. £4,500 – £8,000 5–8 days No planning Building regs for electrical
Mid-range renovation — layout change, quality tiles New layout. Better-quality sanitaryware and tiles. Shower enclosure. £8,000 – £15,000 8–12 days No planning Building regs
High-specification bathroom Designer tiles, wall-hung sanitaryware, freestanding bath, bespoke joinery. £15,000 – £30,000+ 2–6 weeks No planning Material lead times extend programme
En-Suite Creation
En-suite — compact (shower, basin, WC) From part of an existing bedroom. New partition wall + soil stack. £8,000 – £14,000 2–3 weeks No planning Building regs: drainage + electrical
En-suite — full size (bath + shower option) Larger bedroom divided. Full fit-out with bath, shower, basin, WC. £12,000 – £22,000 3–4 weeks No planning Building regs
Wet Room Conversion
Ground floor wet room (concrete slab) Level-access shower floor. Drain cut in. Tanking membrane. Straightforward on slab. £6,000 – £12,000 1–2 weeks No planning Building regs for drainage
Upper floor wet room (timber joists) Floor lowering required (50–75mm). Structural check for heavy stone tiles. Victorian/Edwardian terraces. £9,000 – £18,000 2–3 weeks Building regs Structural engineer if heavy tiles
Period Property Works (Victorian & Edwardian)
Cast iron roll-top bath re-enamelling Restore original bath. Re-enamel in situ or remove and re-spray. £500 – £1,500 1–2 days No planning
Lime plaster repair (bathroom walls) Repair damaged lime plasterwork after tile removal. Like-for-like lime, not gypsum. £600 – £2,500 2–5 days No planning
Lead/cast iron waste pipe replacement Replace original lead wastes and cast iron soil stacks during strip-out. £800 – £3,000 1–3 days Building regs
Conservation-grade bathroom window (replacement) Timber sash or casement to match. Planning required in all Richmond conservation areas. £1,800 – £4,500 1–2 days Planning req. in CA
Professional Fees & Add-ons
Underfloor heating (electric mat) £600 – £1,800 Added to fit-out Building regs (Part P)
New extractor fan with duct (Part F compliance) £300 – £800 Half day Building regs
Structural engineer (wet room or en-suite) £400 – £900 — If floor alteration required
Standard Bathroom Renovation
Basic renovation — sanitaryware swap and retile
Typical cost£4,500 – £8,000
Programme5–8 days
No planning
Like-for-like replacement. New bath, basin, WC, tiles. No layout change.
Mid-range renovation — layout change, quality tiles
Typical cost£8,000 – £15,000
Programme8–12 days
No planning
New layout. Better-quality sanitaryware and tiles. Shower enclosure.
High-specification bathroom
Typical cost£15,000 – £30,000+
Programme2–6 weeks
No planning
Designer tiles, wall-hung sanitaryware, freestanding bath, bespoke joinery.
En-Suite Creation
En-suite — compact (shower, basin, WC)
Typical cost£8,000 – £14,000
Programme2–3 weeks
No planning
From part of an existing bedroom. New partition wall + soil stack.
En-suite — full size (bath + shower option)
Typical cost£12,000 – £22,000
Programme3–4 weeks
No planning
Wet Room Conversion
Ground floor wet room (concrete slab)
Typical cost£6,000 – £12,000
Programme1–2 weeks
No planning
Level-access shower floor. Drain cut in. Tanking membrane.
Upper floor wet room (timber joists)
Typical cost£9,000 – £18,000
Programme2–3 weeks
Building regs
Floor lowering required (50–75mm). Structural check for heavy stone tiles. Victorian/Edwardian terraces.
Period Property Works
Cast iron roll-top bath re-enamelling
Typical cost£500 – £1,500
Programme1–2 days
No planning
Lime plaster repair (bathroom walls)
Typical cost£600 – £2,500
Programme2–5 days
No planning
Like-for-like lime repair, not gypsum patch.
Lead/cast iron waste pipe replacement
Typical cost£800 – £3,000
Programme1–3 days
Building regs
Conservation-grade bathroom window (replacement)
Typical cost£1,800 – £4,500
Planning req. in CA
Timber sash or casement to match. Planning required in all Richmond conservation areas.
Professional Fees & Add-ons
Underfloor heating (electric mat)
Typical cost£600 – £1,800
Building regs (Part P)
New extractor fan with duct (Part F compliance)
Typical cost£300 – £800
Building regs
Structural engineer (wet room or en-suite)
Typical cost£400 – £900
Required if floor alteration needed for wet room on timber joists.

Costs are estimates based on London market rates (October 2026). Inner Richmond postcodes (TW9, TW10, SW13, SW14) typically run 20–30% above these figures. Listed buildings and high-specification projects may carry further premiums. Get 3 matched quotes to establish accurate costs for your property and scope.

What drives cost in a Richmond bathroom renovation:

– Specification – the largest single variable. A mid-range bathroom with standard sanitaryware from a national supplier is a fraction of the cost of a bespoke project with designer tiles, a freestanding bath, and wall-hung sanitaryware from a specialist Richmond supplier.

– Drainage works – Richmond’s Victorian terraces often have original cast iron drainage that hasn’t been touched in 50+ years. Replacing lead waste pipes and cast iron soil stacks while the room is stripped out adds cost but avoids a far more disruptive job later.

– Structural changes – knocking through a bedroom into a bathroom to create a larger bathroom, or removing a wall to combine two rooms, triggers building regulations and structural engineer involvement.

– Wet room conversion – creating a level-access shower (wet room) in a Victorian or Edwardian property requires lowering the floor, installing a tanking membrane, and often a new drain position. Structural considerations on timber floors.

– Listed building status – Richmond Hill, Ham, and Petersham properties that are listed require Listed Building Consent for material changes. Replacing original fixtures or altering historic features (a Victorian cast iron roll-top bath, original encaustic tiles) may require consent.

– En-suite creation – adding an en-suite to a bedroom in a Richmond period property typically requires a new soil stack, ventilation, and a partition wall. Often done alongside a full refurbishment.

Bathroom renovation Islington

Do I need planning permission for a bathroom renovation in Richmond?

For most bathroom renovations, no. Replacing fittings, retiling, replumbing within the existing room, and upgrading heating are all internal works that do not require planning permission, including in Richmond’s 76 conservation areas.

Where consent may be needed:

Listed buildings: if your property is listed and the bathroom contains original historic features a Victorian roll-top bath, original encaustic or geometric floor tiles, or original timber panelling any work affecting those features may require Listed Building Consent. Consult Richmond Council’s heritage team before proceeding if you are uncertain.

Window replacement: if the bathroom renovation includes replacing the window, planning permission is required in all Richmond conservation areas (Article 4 Directions remove Permitted Development for window replacements). Conservation-grade timber windows are required; uPVC is not acceptable.

Building Regulations: While not planning consent, Building Regulations approval is needed for new drainage connections, new electrical installations (Part P), and structural alterations. Your bathroom specialist or contractor coordinates this.

Bathroom Renovation Wandsworth

Bathroom renovation in Richmond's Victorian and Edwardian properties

Richmond’s Victorian and Edwardian housing stock presents specific considerations that don’t apply to a modern flat or new-build bathroom renovation.

Victorian terraces (typically 1860–1900)

Victorian terraces in Twickenham, East Sheen, Barnes, and Mortlake often have bathrooms that were added or converted from a bedroom at some point in the 20th century. Common issues:

– Original timber floors with no waterproofing – all wet areas need tanking or a waterproof membrane before tiling

– Lime plaster walls – lime is softer than modern sand/cement plaster and needs careful handling during tile removal. Damaged lime plaster should be repaired with lime, not patched with gypsum

– Narrow rooms – Victorian terrace bathrooms are often 1.5-2.0m wide, limiting layout options. A specialist bathroom designer can maximise these spaces with wall-hung sanitaryware and recessed storage

– Lead or cast iron waste pipes – many Victorian properties still have original lead waste pipes. A bathroom renovation is the right time to replace these with modern copper or plastic

Edwardian semis and detached (typically 1900–1920)

Edwardian properties in Richmond Hill, Ham, Kew, and St Margarets typically have larger, more generous bathrooms than their Victorian counterparts. Original Edwardian bathrooms with intact geometric floor tiles, roll-top baths, and pedestal basins are found in properties that have not been updated for decades. Options:

– Restore: retain and restore original features. Roll-top cast iron baths can be re-enamelled. Geometric floor tiles can be cleaned and repaired if original. This is the highest-value option for listed properties and those in conservation areas.

– Replace: full replacement with modern sanitaryware and tiles while preserving the room’s proportions. The most common choice for Edwardian properties that have already had one or two previous bathroom renovations.

En-suite creation in a period property

Creating a new en-suite from part of a bedroom in a Richmond Victorian or Edwardian terrace requires: a partition wall, a new soil stack (or connection to an existing one), ventilation (Part F Building Regulations), and waterproofing. The main challenge in period properties is routing the soil stack, often through a bedroom or boxing into a corner. A surveyor or bathroom specialist who knows period terraces will identify the routing options before work starts.

Wet room conversion in Richmond

Wet rooms (level-access showers with a drained floor) are increasingly popular in Richmond for accessible bathrooms and contemporary renovations. On a ground floor with a concrete slab, a wet room is straightforward: the floor drain is cut in, and a tanking membrane is applied.

On upper floors with timber joists, almost universal in Richmond’s Victorian and Edwardian terraces, a wet room requires more careful engineering:

– The floor needs to be lowered (typically 50-75mm) to accommodate the fall to the drain and the tanking layer

– A structural engineer may need to confirm the joists can carry the additional weight if a stone or large-format tile floor is specified

– The ceiling below will be affected, either lowered by a boxed-out section or a dropped ceiling, or the joists are notched (within limits set by Building Regulations)

A Richmond bathroom specialist with period property experience will survey the floor construction before quoting a wet room on an upper floor in a Victorian or Edwardian terrace.

How long does a bathroom renovation in Richmond take?

Standard bathroom renovation (no structural works): 5-10 working days for a 2-3 person team. Allow 2-3 days for strip-out and preparation, 1-2 days for tiling, 1-2 days for sanitaryware installation and plumbing, and 1 day for finishes and sign-off.

Bathroom with drainage works: 8-14 working days. Replacing or re-routing soil stacks and waste pipes adds time before the room can be tiled.

En-suite creation: 2-3 weeks including partition wall, soil stack routing, and full fit-out.

Wet room conversion (upper floor): 2-3 weeks. Floor lowering and drying time for tanking adds to the programme vs a standard shower enclosure.

Listed building or high-specification project: 3-6 weeks. Bespoke tiles, freestanding baths, and specialist finishes typically have longer lead times. Confirm material lead times before fixing a start date.

How do I find a vetted bathroom renovation specialist in Richmond?

Richmond’s period property stock means that not every bathroom fitter is the right choice. What to look for:

1. Period property experience – ask specifically about Victorian and Edwardian projects. The challenges of lime plaster, timber floors, and lead pipe replacement are specific to period properties and require different skills from a modern new-build bathroom.

2. Drainage competence – a bathroom specialist who can manage soil stack routing, drainage re-connection, and Building Regulations sign-off in-house is faster and more reliable than one who subcontracts all plumbing separately.

3. Tile experience – large-format tiles, natural stone, and period-style encaustic tiles all require different installation skills. If your specification includes any of these, ask for completed project photos with those materials.

4. En-suite creation track record – if you’re creating a new en-suite, ask specifically about projects where they routed a new soil stack in a Richmond period terrace. It is a specific, solvable problem with several possible solutions; a contractor who has done it before will quote it accurately.

5. Itemised quotes – labour, tiles, sanitaryware, plumbing, electrical, and any structural or drainage works must appear separately so quotes can be compared on scope.

QuoteMyRenovation matches Richmond homeowners with vetted bathroom renovation specialist contractors with verified bathroom projects in the borough. Submit one brief and receive up to 3 matched quotes from specialists who have reviewed your project.

BOOK NOW: Bathroom Renovation Richmond

    Didn't find the answer?
    Ask us questions directly

    News

    From our blog

    View all

    Sign up to receive the latest updates and news

    COMMON QUESTIONS

    Frequently Asked Questions About Bathroom Renovation Richmond

    Questions homeowners ask us most often before submitting their brief.

    How much does a bathroom renovation cost in Richmond?

    A standard bathroom renovation in Twickenham or Teddington typically costs £4,500-£8,000 for a basic fit-out and £8,000-£15,000 for a mid-range renovation with better-quality tiles and sanitaryware. High-specification bathrooms with designer tiles, freestanding baths, and bespoke joinery cost £15,000-£30,000+. Richmond, Kew, Barnes, and East Sheen (TW9, TW10, SW13, SW14) typically run 20-30% above the London average due to higher labour and material costs.

    Do I need planning permission to renovate a bathroom in Richmond?

    How long does a bathroom renovation take in Richmond?

    Can I keep my original Victorian or Edwardian bathroom features?

    What is the difference between a wet room and a standard shower in Richmond?

    How do I create an en-suite in my Richmond Victorian terrace?

    What bathroom tiles work in a Richmond conservation area?

      Didn't find the answer?
      Ask us questions directly

      FREE · NO OBLIGATION · NO COLD CALLS

      Submit your brief and receive up to 3 matched quotes from vetted bathroom renovation specialists covering Richmond and all inner London boroughs. Free, no obligation. QuoteMyRenovation is London's renovation marketplace connecting Richmond homeowners with vetted local builders since 2024.

      © 2026 QuoteMyRenovation. All rights reserved. London, UK.